Dudek given EMWD design contract for Washington Street pipeline
Dudek was given the Eastern Municipal Water District engineering design services contract for the Washington Street transmission main in Winchester.The EMWD board voted 5-0 Wednesday, Aug. 3, to award the contract to Dudek. The contract will be for $164,535, and the board action appropriated $483,000 to cover the project costs through the bid and award phase.The Washington Street transmission main project will improve the operations of the proposed Belle Terre Tank as well as the water transmission system in the area. Approximately 6,400 liner feet of pipeline 18 inches in diameter will be installed along Washington Street between Fields Drive and Abelia Street. The work will also include a tunnel crossing north of Cottonwood Road.EMWD staff solicited scope of work and fee info