Prepare for I-15 and I-215 full freeway closure from Winchester Road to Murrieta Hot Springs Road

Commuters are advised to use the detour signs to get around the full closure of I-15 freeway between Murrieta Hot Springs Road and Winchester Road. Valley News/Adobe Stock photo
Phase 2 of the I-15 French Valley Parkway Interchange improvements are starting. To prepare for the start of construction, Southern California Edison needs to relocate its overhead power lines to accommodate a new freeway bridge to be built at the I-15 and I-215 junction. The work includes moving the electrical wires that span across the freeway to new, taller poles recently installed. To accomplish this work safely, the freeway needs to be closed temporarily.The I-15 and I-215 freeways will be closed between Winchester and Murrieta Hot Springs roads from Oct. 23 at 10 p.m. until Oct. 24 at 5:30 a.m. as follows: SB I-15 and SB I-215 closed at Murrieta Hot Springs Road and NB I-15 closed at Winchester Road.Detours around the closure will be implemented on Jefferson Ave., Jackson Ave
Subscribe or log in to read the rest of this content.