
Phase 2 of the I-15 French Valley Parkway Interchange improvements are starting. To prepare for the start of construction, Southern California Edison needs to relocate its overhead power lines to accommodate a new freeway bridge to be built at the I-15 and I-215 junction. The work includes moving the electrical wires that span across the freeway to new, taller poles recently installed. To accomplish this work safely, the freeway needs to be closed temporarily.The I-15 and I-215 freeways will be closed between Winchester and Murrieta Hot Springs roads from Oct. 23 at 10 p.m. until Oct. 24 at 5:30 a.m. as follows: SB I-15 and SB I-215 closed at Murrieta Hot Springs Road and NB I-15 closed at Winchester Road.Detours around the closure will be implemented on Jefferson Ave., Jackson Ave