Christensen Brothers given El Rancho Road pipeline construction contract
Christensen Brothers General Engineering, Inc., has been given the Eastern Municipal Water District contract for the construction of the El Rancho Road Pipelines Project.
The EMWD board voted 4-0 July 5, with Stephen Corona absent, to authorize a $2,345,000 construction contract with Christensen Brothers. The board action also authorized a $60,320 contract with Ardurra for engineering services during construction and authorized total appropriations of $3,204,000 which will fund surveying and testing, inspections, EMWD staff labor, and a $235,000 contingency.
The pipeline replacement project is in the Sun City area within the Menifee city limits. Eastern’s routine potable water pipeline replacement program includes identifying key segments which have experienced multiple leaks and line