EMWD approves contracts for Menifee Road waterline

The Aug. 7 meeting of the Eastern Municipal Water District board included approving three contracts to construct a 24-inch waterline along Menifee Road. With Jeff Armstrong absent, the 4-0 board vote awards Weka, Inc., a $3,447,041 contract to construct approximately 5,200 linear feet of 24-inch diameter transmission pipe and abandon and demolish the existing Vista Road Booster Pump Station. Leighton Consulting, Inc., will receive a $99,802 contract for geotechnical observation and testing services during construction. The contract awarded to Krieger & Stewart for engineering and field surveying services during construction is for $64,000. EMWD general manager Joe Mouawad was given the authority including delegation to issue contracts with necessary suppliers and engineering support c
Subscribe or log in to read the rest of this content.