Sukut Construction to construct Temecula water reclamation plant flood control measures
The Eastern Municipal Water District selected Sukut Construction as the contractor to construct flood control measures at the Temecula Valley Regional Water Reclamation Facility.A 5-0 EMWD board vote Sept. 1 awarded a contract to Sukut Construction LLC, for the Santa Ana company’s bid of $2,864,168. The board also approved an $83,443 engineering services contract with Jacobs, which is based in Irvine, and a $114,075 soil testing contract with Inland Foundation Engineering Inc., which is headquartered in San Jacinto. The total appropriation of $3,802,751 also includes expenses for inspection, contract administration, easement acquisition, security service and a contingency amount.The February 2019 storm flooded the water reclamation facility. Jacobs performed a preliminary hydrolo