JE Fuller to perform Upstream Via Lobo Channel study

0
22
JE Fuller Hydrology and Geomorphology Inc. was awarded the Eastern Municipal Water District contract to perform a geomorphic assessment study for the Upstream Via Lobo Channel.A 5-0 EMWD board vote Wednesday, Nov. 2, authorized a $110,980 contract with J.E. Fuller, which is headquartered in Tempe, Arizona. The board approved total appropriations of $155,680 which will also cover $15,000 for surveying and $29,700 for EMWD engineering branch labor.A sewer pipeline 10 inches in diameter was installed in 1991 and provides conveyance from approximately 700 homes in the Solana Vista, Tierra Vista and Saddlewood homeowners associations within the Temecula city limits. The sewer alignment originates at Calle Medusa within the homeowners associations and crosses undeveloped land adjacent to
Subscribe or log in to read the rest of this content.