Krieger & Stewart given RCWD well design contract
Krieger & Stewart Inc., will design two of Rancho California Water District’s Upper Valle de Los Caballos recharge and recovery facility wells.The RCWD board approved the contract with Krieger & Stewart, which is headquartered in Riverside, on a 7-0 vote March 9. The contract will be for $838,400, and Krieger & Stewart will provide design, bid phase and construction support services for the drilling, equipping and construction of Well No. 174 and Well No. 175.The Upper Valle de Los Caballos recharge and recovery facility is located in the 42100 block of Winchester Road. Four new production wells along with monitoring wells are planned as part of the district’s UVDC Optimization Program. The four new wells are expected to increase recovery capacity at the UVDC by at