Lee + Ro awarded RCWD turbine generator design contract

Lee + Ro Inc. has been awarded the Rancho California Water District contract to design turbine generators at two RCWD facilities.The RCWD board voted 7-0 June 8 to award Lee + Ro, whose office is in the City of Industry, a $349,920 contract to design in-line turbine generators at the Upper Valle de Los Caballos recharge and recovery facility and on Washington Avenue adjacent to the Elm Street Pump Station and the Santa Rosa Water Reclamation Facility. The turbines will generate hydroelectric power by using flow and water pressure from existing imported and recycled water deliveries.The Upper Valle de Los Caballos recharge and recovery facility is located in the 42100 block of Winchester Road in Temecula. The facility has two main sources of recharge water: untreated imported water
Subscribe or log in to read the rest of this content.