The California Department of Transportation this week wanted to advise motorists that their $5.2 million slurry seal and rumble strips maintenance project on State Route 371 from Aguanga through Anza sometimes must allow 2-4 hours for materials to cure properly before roadway can be utilized. That issue may cause additional time delays.The project involves dig outs and the installation of safety rumble strips on the inside and outside of the lanes in both directions as well. The hours of operation for that project will be Monday through Saturday from 5 a.m. to 7 p.m. One way traffic control will be in effect for the slurry seal operations.Meanwhile other highway projects include those in Temecula, Menifee, Wildomar, Hemet, Lake Elsinore and Murrieta taking place by Caltrans, City o
Home News Crashes and Traffic Caltrans sees time delays on State Route 371 from Aguanga through Anza