The Eastern Municipal Water District awarded Ardurra Group, Inc., the contract for final design to replace four EMWD pipelines in Sun City, Perris/Menifee, and Moreno Valley.The EMWD board voted 5-0 on Dec. 18 to approve the $242,919 contract and to appropriate a total of $418,000 for the final design and bid phases. The work will replace pipelines along Tanglewood Drive and Wentworth Drive in Sun City, Ethanac Road on the Perris/Menifee border, and Indian Street in Moreno Valley.The Tanglewood Drive work will replace approximately 750 linear feet of existing six-inch diameter cement-mortar lined and coated (CML&C) pipeline along Tanglewood Drive between Ridgemoor Drive and Sun City Boulevard with an eight-inch diameter polyvinyl chloride (PVC) pipeline.A line break and sub