Tag: Metropolitan Water District of Southern California
MWD approves Los Alamos Hills annexation
Los Alamos Hills is within the Murrieta city limits but not currently within the Eastern Municipal Water District or Metropolitan Water District of Southern...
Arcadis given construction management services for Upper Valle de Los Caballos pump station and...
Arcadis was awarded the Rancho California Water District construction management contract recently for the Upper Valle de Los Caballos pump station and chlorine tank.The...
RCWD approves purchase of banked water
The Rancho California Water District will be purchasing untreated imported water to stabilize groundwater supplies.A 7-0 RCWD board vote Thursday, May 18, authorized RCWD...
Brown and Caldwell team with AECOM for landmark Pure Water Southern California program
LOS ANGELES — A joint venture of AECOM and Brown and Caldwell was chosen to provide program and project management support and engineering design...
MWD awards contract for new Pipeline 3 and Pipeline 5 valves
The Metropolitan Water District of Southern California will be replacing air release/vacuum valves on Pipeline 3 and Pipeline 5 of the San Diego Aqueduct,...
MWD authorizes treatment surcharge credit for WMWD
A maintenance shutdown which took longer than expected has forced the Western Municipal Water District to purchase treated water at a higher price, so...
MWD to investigate Colorado River delivery alternatives
The Metropolitan Water District of Southern California obtains water from the Colorado River Aqueduct which transports water from Parker to Lake Mathews and from...
MWD approves annexation of Whitewood Condo/Apartment Project land
The area of the planned Whitewood Condo/Apartment Project development is not within the boundaries of the Eastern Municipal Water District or the Metropolitan Water...
MWD issues contracts for Lake Skinner outlet tower valve replacement, seismic analysis
An April 11 action of the Metropolitan Water District of Southern California board approved two contracts for the Lake Skinner outlet tower.A $1,114,475 contract...
MWD awards contract to rehabilitate Skinner Treatment Plant ozone contactor walls
The walls of the ozone contactors at the Metropolitan Water District of Southern California’s Robert A. Skinner Water Treatment Plant are experiencing cracks, and...