Reilly Construction Management Inc. has been awarded the Elsinore Valley Municipal Water District contract to oversee the third phase of the district’s backflow device replacement project.A 5-0 EVMWD board vote awarded Reilly Construction Management, which is based in Escondido, a $209,538 professional services contract. The board action authorized total expenditures of $210,586 which will allow for $1,048 in overhead costs.Public water systems are required by state law to protect their water supplies from contamination by implementing a cross-connection control program which must include the installation of backflow prevention assemblies if a potential hazard to the water supply is identified. Backflow assemblies must be tested annually. The district identified 87 single check b