MWD issues contracts for Lake Skinner outlet tower valve replacement, seismic analysis
An April 11 action of the Metropolitan Water District of Southern California board approved two contracts for the Lake Skinner outlet tower.A $1,114,475 contract will be given to B&K Valves and Equipment Inc., for the replacement of two valves at the Lake Skinner outlet tower. The contract with Stantec Consulting Services Inc., will be for up to $900,000 (the actual amount will be based on work performed, and if more than $900,000 is needed, MWD staff can return to the board for the additional appropriation authorization) and will provide a detailed seismic analysis of the Lake Skinner outlet tower.The Lake Skinner outlet tower is the primary means of drawing water from the lake for treatment at the Robert A. Skinner Water Treatment Plant or for conveyance to downstream users w