Schuler Contractors given EMWD contract for Hemet Water Filtration Plant pipe repair

The Eastern Municipal Water District board awarded Schuler Contractors, Inc., the EMWD contract to replace and repair piping at the district’s Hemet Water Filtration Plant.The 4-0 vote Wednesday, May 1, with Randy Record absent, approved a $240,193 contract with Schuler Contractors for the pipe repair and replacement project at the filtration plant’s Membrane Building. The board authorized total additional appropriations of $300,000 which will also cover inspection, internal labor and a contingency.The Hemet Water Filtration Plant is at the intersection of North Kirby Street and Commonwealth Avenue. It treats water obtained from the State Water Project, which conveys supply from Oroville to Lake Skinner, utilizing ultrafiltration membrane technology to bring the water to potabl
Subscribe or log in to read the rest of this content.