EVMWD approves construction management contract for Mission Trail trunk sewer

Mott MacDonald Group, Inc., has been given the Elsinore Valley Municipal Water District construction management and observation contract for the Mission Trail Trunk Sewer project.The EVWMD board voted 4-0 March 13, with Darcy Burke absent, to approve the $983,148.40 contract with Mott MacDonald Group. The trunk sewer will be constructed between Malaga Road and the district’s B-2 Lift Station.Last year Carollo Engineers, Inc., prepared the district’s Sewer Master Plan. That plan identified significant capacity limitations in the existing 21-inch diameter trunk sewer within Mission Trail between the B-1 Lift Station and the McVicar Lift Station. That reach of pipeline was also identified as an improvement need during the 2016 Sewer Master Plan and was further analyzed by Carollo
Subscribe or log in to read the rest of this content.