Mott MacDonald Group, Inc., has been given the Elsinore Valley Municipal Water District construction management and observation contract for the Mission Trail Trunk Sewer project.The EVWMD board voted 4-0 March 13, with Darcy Burke absent, to approve the $983,148.40 contract with Mott MacDonald Group. The trunk sewer will be constructed between Malaga Road and the district’s B-2 Lift Station.Last year Carollo Engineers, Inc., prepared the district’s Sewer Master Plan. That plan identified significant capacity limitations in the existing 21-inch diameter trunk sewer within Mission Trail between the B-1 Lift Station and the McVicar Lift Station. That reach of pipeline was also identified as an improvement need during the 2016 Sewer Master Plan and was further analyzed by Carollo